Posts Tagged 'Holzfertigteilbauweise'

SUPERMARKET MPREIS ROSENTALERSTRASSE, KLAGENFURT, AUSTRIA

Exceptional architecture and store design (Extract from the press release by Natalie Seidel, MPREIS) MPREIS stands for regionality, sustainability and excellent design. The new store in the Carinthian capital is a prime example of this. The Tyrolean architecture firm i-unit

SUPERMARKET MPREIS ROSENTALERSTRASSE, KLAGENFURT, AUSTRIA

Exceptional architecture and store design (Extract from the press release by Natalie Seidel, MPREIS) MPREIS stands for regionality, sustainability and excellent design. The new store in the Carinthian capital is a prime example of this. The Tyrolean architecture firm i-unit

LACKENHOF, ÖTSCHER, LOWER AUSTRIA

Talstation Lackenhof Ötscher, Oberösterreich 1,2 Mio €, 800 m2 floor space, 1.500 € / m2 Erdberührte Wände in Sichtbeton. Tragkonstruktion aus Leimbindern und Brettstapeldecken Dach extensiv begrünt. Fassade: Lärchenschalung

LACKENHOF, ÖTSCHER, LOWER AUSTRIA

Talstation Lackenhof Ötscher, Oberösterreich 1,2 Mio €, 800 m2 floor space, 1.500 € / m2 Erdberührte Wände in Sichtbeton. Tragkonstruktion aus Leimbindern und Brettstapeldecken Dach extensiv begrünt. Fassade: Lärchenschalung

PRIVATE HOUSING „HAUS I“, DORNBIRN, AUSTRIA

Einfamilienhaus in Dornbirn, Vorarlberg Baubeginn erfolgt Fertigstellung Sommer 2012

PRIVATE HOUSING „HAUS I“, DORNBIRN, AUSTRIA

Einfamilienhaus in Dornbirn, Vorarlberg Baubeginn erfolgt Fertigstellung Sommer 2012

PRIVATE HOUSING „HAUS G“, INNSBRUCK, AUSTRIA

private house Innsbruck, Tyrol completion 2007 Low-energy house, air heat pump Controlled living space ventilation, triple glazing Prefabricated timber frame construction: 1 week prefabrication in the factory, 1 week assembly of shell on site Total construction time: 7 months Bauzeit:

PRIVATE HOUSING „HAUS G“, INNSBRUCK, AUSTRIA

private house Innsbruck, Tyrol completion 2007 Low-energy house, air heat pump Controlled living space ventilation, triple glazing Prefabricated timber frame construction: 1 week prefabrication in the factory, 1 week assembly of shell on site Total construction time: 7 months Bauzeit:

EXTENSION PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA

Der Baum kriegt einen Ast Fertigstellung, completion 2010

EXTENSION PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA

Der Baum kriegt einen Ast Fertigstellung, completion 2010

PRIVATE RESIDENCE MUTTERS, STUDY 2013

Private residence in the alps Tyrol 2014

PRIVATE RESIDENCE MUTTERS, STUDY 2013

Private residence in the alps Tyrol 2014

DENTAL LABORATORY „Zahnlabor B°1“, WÖRGL, AUSTRIA

dental laboratory Wörgl, Tyrol Niedrigenergiehaus, EG Stahlbeton, OG Holzbauweise completion 2007, 1300 € / m2

DENTAL LABORATORY „Zahnlabor B°1“, WÖRGL, AUSTRIA

dental laboratory Wörgl, Tyrol Niedrigenergiehaus, EG Stahlbeton, OG Holzbauweise completion 2007, 1300 € / m2

GÄSTEHAUS GUCHER

private house Völkermarkt, Kärnten study 2005

GÄSTEHAUS GUCHER

private house Völkermarkt, Kärnten study 2005