Posts Tagged 'Holzfertigteilbauweise'
SUPERMARKET MPREIS ROSENTALERSTRASSE, KLAGENFURT, AUSTRIA
Exceptional architecture and store design (Extract from the press release by Natalie Seidel, MPREIS) MPREIS stands for regionality, sustainability and excellent design. The new store in the Carinthian capital is a prime example of this. The Tyrolean architecture firm i-unit
SUPERMARKET MPREIS ROSENTALERSTRASSE, KLAGENFURT, AUSTRIA
Exceptional architecture and store design (Extract from the press release by Natalie Seidel, MPREIS) MPREIS stands for regionality, sustainability and excellent design. The new store in the Carinthian capital is a prime example of this. The Tyrolean architecture firm i-unit
LACKENHOF, ÖTSCHER, LOWER AUSTRIA
Talstation Lackenhof Ötscher, Oberösterreich 1,2 Mio €, 800 m2 floor space, 1.500 € / m2 Erdberührte Wände in Sichtbeton. Tragkonstruktion aus Leimbindern und Brettstapeldecken Dach extensiv begrünt. Fassade: Lärchenschalung
LACKENHOF, ÖTSCHER, LOWER AUSTRIA
Talstation Lackenhof Ötscher, Oberösterreich 1,2 Mio €, 800 m2 floor space, 1.500 € / m2 Erdberührte Wände in Sichtbeton. Tragkonstruktion aus Leimbindern und Brettstapeldecken Dach extensiv begrünt. Fassade: Lärchenschalung
PRIVATE HOUSING „HAUS I“, DORNBIRN, AUSTRIA
Einfamilienhaus in Dornbirn, Vorarlberg Baubeginn erfolgt Fertigstellung Sommer 2012
PRIVATE HOUSING „HAUS I“, DORNBIRN, AUSTRIA
Einfamilienhaus in Dornbirn, Vorarlberg Baubeginn erfolgt Fertigstellung Sommer 2012
PRIVATE HOUSING „VILLA S“, BAUMKIRCHEN, AUSTRIA
Villa S, Baumkirchen Bauzeit 6 Monate
PRIVATE HOUSING „HAUS G“, INNSBRUCK, AUSTRIA
private house Innsbruck, Tyrol completion 2007 Low-energy house, air heat pump Controlled living space ventilation, triple glazing Prefabricated timber frame construction: 1 week prefabrication in the factory, 1 week assembly of shell on site Total construction time: 7 months Bauzeit:
PRIVATE HOUSING „HAUS G“, INNSBRUCK, AUSTRIA
private house Innsbruck, Tyrol completion 2007 Low-energy house, air heat pump Controlled living space ventilation, triple glazing Prefabricated timber frame construction: 1 week prefabrication in the factory, 1 week assembly of shell on site Total construction time: 7 months Bauzeit:
EXTENSION PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA
Der Baum kriegt einen Ast Fertigstellung, completion 2010
EXTENSION PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA
Der Baum kriegt einen Ast Fertigstellung, completion 2010
PRIVATE RESIDENCE MUTTERS, STUDY 2013
Private residence in the alps Tyrol 2014
DENTAL LABORATORY „Zahnlabor B°1“, WÖRGL, AUSTRIA
dental laboratory Wörgl, Tyrol Niedrigenergiehaus, EG Stahlbeton, OG Holzbauweise completion 2007, 1300 € / m2
DENTAL LABORATORY „Zahnlabor B°1“, WÖRGL, AUSTRIA
dental laboratory Wörgl, Tyrol Niedrigenergiehaus, EG Stahlbeton, OG Holzbauweise completion 2007, 1300 € / m2