Posts Tagged 'Pfosten-Riegel Bauweise'

PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA

The client wanted a Palladian villa for €100,000 with a basement, ground floor, first floor and attic. I left out the ground floor and first floor so that we could stay within the budget. What remained were the roof (‘tree

PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA

The client wanted a Palladian villa for €100,000 with a basement, ground floor, first floor and attic. I left out the ground floor and first floor so that we could stay within the budget. What remained were the roof (‘tree

PRIVATE HOUSING „HAUS G“, INNSBRUCK, AUSTRIA

private house Innsbruck, Tyrol completion 2007 Low-energy house, air heat pump Controlled living space ventilation, triple glazing Prefabricated timber frame construction: 1 week prefabrication in the factory, 1 week assembly of shell on site Total construction time: 7 months Bauzeit:

PRIVATE HOUSING „HAUS G“, INNSBRUCK, AUSTRIA

private house Innsbruck, Tyrol completion 2007 Low-energy house, air heat pump Controlled living space ventilation, triple glazing Prefabricated timber frame construction: 1 week prefabrication in the factory, 1 week assembly of shell on site Total construction time: 7 months Bauzeit:

EXTENSION PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA

Der Baum kriegt einen Ast Fertigstellung, completion 2010

EXTENSION PRIVATE HOUSING „BAUMHAUSWASSER“, CARINTHIA, AUSTRIA

Der Baum kriegt einen Ast Fertigstellung, completion 2010